BIM Coordination and Clash Detection Explained
On a building project, architecture, structure and services are designed by different teams, often in different offices. Each team can produce a correct model of its own work, and the combined result can still contain conflicts: a duct through a beam, a pipe through a door, a cable tray where the ceiling should be. BIM coordination is the process of finding and resolving those conflicts in the model, before they appear on site. Clash detection is the tool that finds them. This guide explains how the process works and what each part involves.
By Fayez 5 min read
What is BIM coordination?
BIM coordination is the regular process of combining the models from each discipline, checking them against each other, and agreeing who changes what. It is a team activity as much as a software one. The software finds the problems, but people decide how to solve them, because most solutions involve design judgement: which service moves, which opening is enlarged, which route is changed.
Coordination relies on well-built discipline models. If you are commissioning models, what a Revit model should contain lists the content to expect, and BIM level of development explains how much detail each stage needs. A model that is too sketchy at the time of coordination hides clashes, and a model that is more detailed than the stage needs slows everything down.
What is clash detection?
Clash detection is the automatic comparison of two sets of elements in a combined model to find where they occupy the same space. It is usually run in a coordination tool such as Navisworks, although modelling software has its own checks too. You choose two selections, for example ducts and structural beams, set the rules and run the test. The tool reports each clash with a location and the elements involved.
There are three common kinds of clash:
- Hard clash. Two elements physically occupy the same space, such as a pipe passing through a column.
- Soft clash. An element intrudes into the clearance zone around another, such as an access or maintenance space, or insulation thickness that was not modelled.
- Workflow or timing clash. Items conflict in sequence, such as equipment that has to be installed before the surrounding work blocks the route.
Hard and soft clashes can be found by software. Sequence problems need the construction programme, which is why the contractor is usually part of coordination.
How does the coordination process work?
- Set the rules. Agree the model origin and coordinates, naming, file formats, update schedule, clearance zones and the level of development at each stage. These usually go into a BIM execution plan.
- Collect the models. Each discipline exports its model at the agreed date. The files are linked into a federated model, a single combined model that stays linked to the originals. The CAD file formats guide explains exchange formats such as IFC.
- Run the tests. Run clash tests between pairs of disciplines, for example structure against services, and services against each other.
- Review the results. Group related clashes, remove false positives, and rank what matters. One misplaced riser can produce dozens of reported clashes, so grouping makes the list manageable.
- Assign and resolve. Each issue goes to the discipline that should change, with a screenshot, location and comment. They update their model.
- Repeat. A new set of models is issued and the tests are rerun. The cycle continues until the remaining items are accepted or resolved.
Who does what in coordination?
- BIM coordinator. Runs the process, combines models, runs clash tests, reports and tracks issues.
- Discipline modellers and designers. Resolve the issues assigned to them and keep their models current.
- Design leads and engineers. Decide on solutions that affect design intent or performance.
- Contractor and trades. Advise on constructability, sequence and installation space.
OEG's CAD and BIM teams include BIM coordinators working in Navisworks, with model federation and BIM standards. See the BIM modelling and coordination services page and the dedicated CAD and BIM team.
What makes coordination work well?
- A shared origin. If models use different coordinates, they will not line up and every test will be wrong.
- A fixed rhythm. Regular coordination rounds, with model issue dates agreed in advance, work better than ad hoc checks.
- Sensible tolerances. Set tolerances so that trivial touches are not reported. Too many false clashes make people ignore the report.
- Clear ownership. Each clash has one owner and a status, so that nothing sits unassigned.
- Early start. Coordination is cheapest when the design is still flexible. It is harder to move a duct than to move a line.
- Existing conditions. For refurbishment, coordinate with a model of the existing building, for example one built through scan to BIM.
What are the limits of clash detection?
Clash detection only checks what is modelled. If hangers, supports, insulation or access zones are not in the model, the software cannot find conflicts with them. It also does not test whether a design works: a clash-free model can still have a poorly performing system. And it cannot replace review of the drawings that come from the models. Where the output will be used for fabrication, the drawings still need a proper check, as described in how to review shop drawings before fabrication.
If you are bringing in outside modellers, read how to hire a remote BIM team and working with an offshore drafting team for guidance on handover and review. Or book a consultation to talk about coordination on your project.
Frequently asked questions
When should BIM coordination start?
As early as there are models from more than one discipline. Conflicts are cheaper to resolve while the design can still change.
Is a model with no clashes a correct model?
No. It means that the tested elements do not conflict. The model can still be incomplete, or the design can still have problems that the tests were not set up to find.
Which software is used for clash detection?
Navisworks is widely used for combining models and running clash tests. Revit and other modelling tools offer interference checks within their own models.
What is a federated model?
A federated model combines separate discipline models into one view for checking. The original models stay separate and are still owned by their authors.