BIM LOD Explained: LOD 100 to 500 by Project Stage

BIM LOD, short for level of development, describes how much detail and how reliable a model element is at a given stage of a project. The scale runs from LOD 100, a simple symbol or mass, up to LOD 500, an element verified against the finished building. Agreeing the LOD before modelling starts is the most effective way to avoid rework, because it tells the modeller what to build, what to leave out and how much the team can rely on each element.

By Fayez 5 min read

What does LOD mean in BIM?

LOD is a way of describing the maturity of an element in a model. The numbers 100 to 500 come from the American Institute of Architects and are detailed in the BIMForum Level of Development Specification, which describes what an element must contain at each level for many building systems. LOD is not the same as the size or the complexity of a model. A model can contain some elements at LOD 200 and others at LOD 350 at the same time, and that is normal.

What do LOD 100 to 500 mean?

LOD 100: concept

Elements are shown as a symbol, a mass or a placeholder. Size, shape and position are indicative only. It suits early feasibility, massing and area studies.

LOD 200: approximate geometry

Elements are modelled as generic objects with approximate size, shape, quantity and location. A wall is a wall of about the right thickness, a duct is a run of about the right size. It suits schematic design and early coordination.

LOD 300: precise geometry

Elements are modelled with accurate size, shape, location and orientation, and can be measured directly from the model. It suits design development, construction documents and most drawing production.

LOD 350: coordination

LOD 350 adds the interfaces between elements: supports, connections and the clearances needed to coordinate with other trades. It suits clash detection and multi-discipline coordination.

LOD 400: fabrication

Elements contain the detail needed to fabricate and install them, such as exact dimensions, connections, reinforcement or assembly information. It suits shop drawings and fabrication models.

LOD 500: as-built

Elements are field-verified to represent what was actually built. LOD 500 is about confirmed accuracy rather than additional detail, and is used for handover and facility records. Scan data is often used to verify these models; see our guide to the Scan to BIM process.

How is LOD different from LOI?

LOD is usually used for the geometry of an element, and LOI, level of information, for the data attached to it, such as material, manufacturer, fire rating or asset tag. A model can be geometrically precise and still carry no useful data, or the reverse. Projects that follow ISO 19650 describe both together as the level of information need. Whatever the vocabulary, write down both the geometry and the data you expect for each element.

Which LOD do you need at each project stage?

StageTypical LODPurpose
Concept and feasibility100Massing, areas, early options
Schematic design200Layout, early coordination, rough quantities
Design development and documents300Drawings, schedules, measurable quantities
Coordination350Clash detection between disciplines
Fabrication and shop drawings400Manufacture and installation
Handover500As-built record and facility management

These are common starting points, not rules. The contract or the BIM execution plan decides what each project needs.

How do you specify LOD in a brief?

  1. State the purpose of the model. Design, coordination, fabrication, quantities or as-built records each need a different level.
  2. Set the LOD per discipline and per element. Architecture, structure and MEP rarely need the same level at the same time.
  3. Add the information required for each element: material, type, mark or classification.
  4. Name the standard you are using, for example the BIMForum specification or your own LOD table.
  5. List what is excluded. Anything not mentioned is a source of disagreement later.
  6. Agree the tolerance for as-built or scan-based work.

The same points apply to any drafting brief; see our guide on how to brief a CAD drafter.

What mistakes should you avoid?

  • Asking for LOD 400 everywhere. It costs more and slows the model without helping stages that do not need it.
  • Using LOD 300 for coordination. Clashes at supports and connections are missed if the interfaces are not modelled.
  • Treating LOD as a quality score. A lower LOD is not a worse model. It is the right level for an earlier stage.
  • Ignoring information. Geometry without data limits schedules and quantities.
  • Not updating the table. The LOD needed changes as the project moves on, so review it at each stage.

Can a remote team work to your LOD?

Yes, if the LOD table, templates and naming rules are written down. OEG's remote team models from LOD 100 to 500 in Revit, AutoCAD and Navisworks, inside your templates and standards. You receive named profiles in 24 to 48 hours, interview every candidate, and pay one monthly rate per person with no recruitment fee. See our BIM modelling and coordination services, the pages for UK projects and US projects, and our guide on how to hire a remote BIM team.

For the content of each discipline model, see Revit modeling services: what a model should contain.

For how models are combined and checked at each stage, read BIM coordination and clash detection explained.

Frequently asked questions

What does LOD stand for in BIM?

LOD stands for level of development. It describes how detailed and how reliable a model element is at a given stage, on a scale from 100 to 500.

What is the difference between LOD 300 and LOD 400?

LOD 300 shows accurate size, shape and position for design and documentation. LOD 400 adds the fabrication and installation detail needed for shop drawings and manufacture.

What is LOD 350 used for?

LOD 350 includes the interfaces between elements, such as supports and connections, so that disciplines can be coordinated and clashes found before construction.

Is a higher LOD always better?

No. A higher LOD takes more time and cost. Choose the lowest level that meets the purpose of the model at that stage.

What is the difference between LOD and LOI?

LOD describes the geometry of an element and LOI describes the data attached to it. Both should be specified in the brief.

To agree the right level for your project, book a consultation.

How it compares

Four ways to add the same engineer

The same role, filled four different ways. What changes is who carries the cost, the risk and the paperwork.

How hiring through a recruitment agency, a freelance marketplace, your own offshore entity and OEG compare
ConsiderationRecruitment agencyFreelance marketplaceYour own offshore entityOEG
Upfront feeTypically 15–25% of first year salaryNoneEntity setup and legalNone
Who employs themYou doNobodyYou doOEG does
If they are not rightYou absorb itRe-hire and re-briefYou absorb itReplaced at our cost
Cover for leaveYour problemNoneYour problemIncluded
Vetted before you meet themVariesNoYou vet themYes, and you interview
Typical time to startWeeks to monthsDays, unvettedMonthsAbout two weeks
Payroll and complianceYoursYoursYoursOurs

Agency fees are the usual market range and vary by firm and seniority. Everything in the OEG column is covered by one monthly rate per person.

Next step

Named profiles and a rate in 24 to 48 hours

It starts with a 30 minute call. You speak to the person who would run your account, and leave with a proposed team and a rate rather than a sales pitch.

  • Profiles in 24 to 48 hours, three working days at the outside
  • You interview every candidate before they start
  • If someone is not right, we replace them at our cost
  • No recruitment fee, no percentage of salary, no obligation

Pick a time on the calendarSend the brief instead

Prefer email? Write to Support@oegoutsourcing.com and we reply within one business day.

Book a free 30 minute call