Book a free 30 minute call

Revit Modeling Services: What a Model Should Contain

A Revit model is more than a 3D view. It is a set of objects, each with a type, a position and data, organised so that drawings and schedules can be generated from it. When you buy Revit modeling services, the useful question is what the model should contain for each discipline. This guide lists the typical content for architecture, structure and MEP, and the checks that apply to all of them.

By Fayez 5 min read

What does every Revit model need, whatever the discipline?

Some basics apply across the board. Without them, a model is hard to coordinate and hard to trust.

  • Shared coordinates and origin. Every discipline model should use the same project base point and level definitions, so that models line up when linked.
  • Levels and grids. These are the skeleton of the model. They should match the design drawings and be locked in place early.
  • A naming standard. Families, types, views, sheets and worksets should follow one naming rule, ideally taken from the project BIM execution plan.
  • Worksets. A sensible split, for example by discipline or building zone, keeps the model manageable when several people work in it.
  • A defined level of development. Agree how detailed each element should be at each stage. Our guide to BIM LOD 100 to 500 explains the scale.
  • A clean file. Unused families, imported CAD files and warnings should be reviewed and reduced before the model is issued.

What should an architectural model contain?

The architectural model describes the building envelope, the spaces and the finishes. A typical model includes:

  • Walls, floors, roofs and ceilings built as real types with layers, not as flat shapes.
  • Doors, windows and openings hosted in their walls, each with a type mark so they can be scheduled.
  • Stairs, ramps, railings and shafts, positioned to match the structure.
  • Rooms or spaces with names, numbers and areas, placed in bounded spaces.
  • Furniture, fixtures and fittings, to the extent the brief requires.
  • Views, sections, elevations, schedules and sheets set up from the model, with annotation and dimensions.

What should a structural model contain?

The structural model carries the load-bearing frame and must be coordinated with the architecture and the services. Typical content includes:

  • Foundations, columns, beams, slabs, load-bearing walls and bracing, placed to the correct levels and grids.
  • Correct material and section sizes for each element, as given by the structural engineer.
  • Openings and penetrations through slabs and walls, modelled where services pass through.
  • Reinforcement or steel connections, only if the agreed level of development calls for it.
  • Structural elements marked so they can be scheduled and filtered separately from architectural ones.

A model is not a substitute for the engineer's design. The modeller builds what the designer specifies, and sizes should be confirmed by the responsible engineer.

What should an MEP model contain?

MEP covers mechanical, electrical and plumbing, and is usually split into separate models or worksets. Typical content includes:

  • Mechanical. Ducts, pipes, fittings, air terminals and main equipment, with systems assigned so that flow and connections can be checked.
  • Electrical. Cable trays, conduits, panels, lighting fixtures, devices and their circuit or system information.
  • Plumbing and drainage. Pipes with the correct slope, fixtures, valves and equipment, assigned to named systems.
  • Clear space around equipment for access and maintenance, shown where the brief requires it.
  • Hangers, supports and sleeves, when the level of development includes them.

MEP models normally need the most coordination, because services compete for the same ceiling and riser space. Clashes between pipes, ducts and structure are found by running clash checks across the linked models.

What data should the model carry?

Geometry is only half of the model. The other half is information. Agree in the brief which parameters must be filled in, for example type, material, fire rating, manufacturer, system name, level and a unique mark. Use the same parameter names across disciplines, or schedules will not combine. Data that nobody uses should not be requested, because it takes time to fill in and to check.

How do you check a model before accepting it?

  • Open it and review the warnings. A long list of unresolved warnings often points to modelling shortcuts.
  • Check that levels, grids and coordinates match the linked models and the design drawings.
  • Compare a sample of sheets and schedules with the source drawings.
  • Run a clash check across the disciplines and review the results with the team.
  • Confirm that required parameters are filled and consistently named.
  • Check that the file opens in the Revit version you specified.

For a sensible handover, send the template, the standards, the source drawings and a BIM execution plan if you have one. The file format guide, CAD file formats: DWG, DXF, RVT and IFC, explains what to ask for when sharing models. If the model starts from an existing building, read about scan to BIM, and for the team side see how to hire a remote BIM team.

OEG's team works in Revit, AutoCAD and Navisworks, from LOD 100 to 500. See our BIM modelling and coordination services and the dedicated CAD and BIM team, or book a consultation to discuss your project.

Once the discipline models exist, BIM coordination and clash detection explains how they are checked against each other.

Frequently asked questions

What level of detail should a Revit model have?

It depends on the purpose of the model at that stage. A concept model needs far less than one used for coordination or fabrication. Agree the level of development for each discipline in the brief.

Should architecture, structure and MEP be in one model?

Usually they are separate models linked together. This lets each discipline work independently while the combined models are checked for clashes.

Can drawings be produced from the Revit model?

Yes. Plans, sections, elevations and schedules are generated from the model. They still need annotation, dimensions and checking before they are issued.

What should I send to a Revit modeller?

Send the design drawings, any existing models, your template and standards, the target Revit version, the level of development required and the list of parameters you need filled in.

How it compares

Four ways to add the same engineer

The same role, filled four different ways. What changes is who carries the cost, the risk and the paperwork.

How hiring through a recruitment agency, a freelance marketplace, your own offshore entity and OEG compare
ConsiderationRecruitment agencyFreelance marketplaceYour own offshore entityOEG
Upfront feeTypically 15–25% of first year salaryNoneEntity setup and legalNone
Who employs themYou doNobodyYou doOEG does
If they are not rightYou absorb itRe-hire and re-briefYou absorb itReplaced at our cost
Cover for leaveYour problemNoneYour problemIncluded
Vetted before you meet themVariesNoYou vet themYes, and you interview
Typical time to startWeeks to monthsDays, unvettedMonthsAbout two weeks
Payroll and complianceYoursYoursYoursOurs

Agency fees are the usual market range and vary by firm and seniority. Everything in the OEG column is covered by one monthly rate per person.

Next step

Named profiles and a rate in 24 to 48 hours

It starts with a 30 minute call. You speak to the person who would run your account, and leave with a proposed team and a rate rather than a sales pitch.

  • Profiles in 24 to 48 hours, three working days at the outside
  • You interview every candidate before they start
  • If someone is not right, we replace them at our cost
  • No recruitment fee, no percentage of salary, no obligation

Pick a time on the calendarSend the brief instead

Prefer email? Write to Support@oegoutsourcing.com and we reply within one business day.

Book a free 30 minute call